Subject: Supplemental Weekend Outage Report for 9-14-01 through 9-17-01
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Enron Change Management Announcement@ENRON <IMCEANOTES-Enron+20Change+20Management+20Announcement+40ENRON@ENRON.com>
X-To: Houston Outage Report@ENRON <??SHouston Outage Report@ENRON>
X-cc: 
X-bcc: 
X-Folder: \RBENSON (Non-Privileged)\Benson, Robert\Inbox
X-Origin: Benson-R
X-FileName: RBENSON (Non-Privileged).pst


------------------------------------------------------------------------------------------------------
W E E K E N D   S Y S T E M S   A V A I L A B I L I T Y

F O R

September 14, 2001 5:00pm through September 17, 2001 12:00am
------------------------------------------------------------------------------------------------------

SCHEDULED SYSTEM OUTAGES:   NA 

ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

AZURIX: No Scheduled Outages.

EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

EDI SERVER:  
Impact:  CORP                POSTPONED
Time:  Sat 9/15/2001 at  11:00:00 PM CT thru Sun 9/16/2001 at  3:00:00 AM CT
	Sat 9/15/2001 at    9:00:00 PM PT thru Sun 9/16/2001 at  1:00:00 AM PT
	Sun 9/16/2001 at  5:00:00 AM London thru Sun 9/16/2001 at  9:00:00 AM London
Outage:  Upgrade EDINET
Environments Impacted:  Corp
Purpose: Improve reliability, performance, and increase information output.
Backout: 1. Switch IP DNS Entries for the Corp Domain for edinet.enron.com and ecnet.enron.com back to the original state
2. Restore database tables for edi_hub systems.   
3. Switch IP DNS Entries for the Corp Domain for edinet.enron.com and ecnet.enron.com.
4. Save old code and script changes and install new code and configure new code from edi_qa.
Contact(s): 	John Kratzer  713-345-4642  713-318-4746
		Jack Metkus  713-853-0362  713-288-0743
 
EES:     SEE ORIGINAL REPORT
  
ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages

ENRON NORTH AMERICAN LANS:  ALSO SEE ORIGINAL REPORT
Impact:  EBS
Time:  Sat 9/15/2001 at  12:00:00 PM CT thru Sat 9/15/2001 at    1:00:00 PM CT
	Sat 9/15/2001 at  10:00:00 AM PT thru Sat 9/15/2001 at  11:00:00 AM PT
	Sat 9/15/2001 at  6:00:00 PM London thru Sat 9/15/2001 at  7:00:00 PM London
Outage:  Converting EBS to CORP Network
Environments Impacted:  EBS
Purpose: Incorporating EBS and CORP network
Backout: 
Contact(s): 	George Nguyen    713-853-0691 
 
Impact:  CORP
Time:  Sat 9/15/2001 at  9:00:00 AM CT thru Sat 9/15/2001 at    1:00:00 PM CT 
	Sat 9/15/2001 at  7:00:00 AM PT thru Sat 9/15/2001 at  11:00:00 AM PT
	Sat 9/15/2001 at  3:00:00 PM London thru Sat 9/15/2001 at  7:00:00 PM London
Outage:  Uplink Corrections
Environments Impacted:  ECN 4
Purpose: To connect network switches to standard
Backout: If any switches do not come back online, I will connect them back to the original connection.
Contact(s): 	Mark Trevino    713-345-9954

Impact:  CORP
Time:  Fri 9/14/2001 at  6:00:00 PM CT thru Fri 9/14/2001 at  7:00:00 PM CT
	Fri 9/14/2001 at  4:00:00 PM PT thru Fri 9/14/2001 at  5:00:00 PM PT
	Sat 9/15/2001 at 12:00:00 AM London thru Sat 9/15/2001 at  1:00:00 AM London
Outage:  Hopix and Extpix Flash and IOS upgrade
Environments Impacted:  Corp
Purpose: Need to bring IOS to standard level. image requires more flash memory
Backout: Replace original flash card and set another day and time to upgrade
Contact(s): 	Chris Trota  713-345-1697  
 
FIELD SERVICES:  No Scheduled Outages.

INTERNET: No Scheduled Outages.

LOTUS NOTES:  SEE ORIGINAL REPORT
 
MESSAGING:     SEE ORIGINAL REPORT
  
MARKET DATA: No Scheduled Outages.

NT: No Scheduled Outages.

OS/2:  No Scheduled Outages.

OTHER SYSTEMS:   ALSO SEE ORIGINAL REPORT
Impact:  CORP
Time:  Fri 9/14/2001 at  5:00:00 PM CT thru Fri 9/14/2001 at  7:00:00 PM CT
	Fri 9/14/2001 at  3:00:00 PM PT thru Fri 9/14/2001 at  5:00:00 PM PT
	Fri 9/14/2001 at  11:00:00 PM London thru Sat 9/15/2001 at  1:00:00 AM London
Outage:  Move LMS Production DB instance
Environments Impacted:  All
Purpose: HRGIM will be responsible for the Docent LMS application.
Backout: 
Contact(s): 	Brandon Bangerter    
		Raj Perubhatla  713-345-8016  281-788-9307
		Brian Ellis  713-345-8017  713-446-6193
		Mark Calkin  713-345-7831  

Impact:  EBS
Time:  Fri 9/14/2001 at  6:00:00 PM CT 
	Fri 9/14/2001 at  4:00:00 PM PT
	Sat 9/15/2001 at  12:00:00 AM London
Outage:  Decommission Pleasanton, CA EBS Servers
Environments Impacted:  EBS
Purpose: Office was sold and the servers are not required.
Backout: Business critical data has been copied to Houston by Jeff Hughes and is already being backed up.
Contact(s): 	Dan Dietrich    713-345-8836
 
SITARA:    SEE ORIGINAL REPORT
 
SUN/OSS SYSTEM: No Scheduled Outages.

TELEPHONY: No Scheduled Outages

TERMINAL SERVER:  No Scheduled Outages.

UNIFY:  No Scheduled Outages.
 
SCHEDULED SYSTEM OUTAGES:   SA 
Impact:  File Server (EIBRASAL1C01)
Time:  Sat 9/15/2001 at  5:00:00 AM CT thru Sat 9/15/2001 at  8:00:00 AM CT
	Sat 9/15/2001 at  3:00:00 AM PT thru Sat 9/15/2001 at  6:00:00 AM PT
	Sat 9/15/2001 at  7:00:00 AM Sao Paulo thru Sat 9/15/2001 at  10:00:00 AM Sao Paulo
	Sat 9/15/2001 at  11:00:00 AM London thru Sat 9/15/2001 at  2:00:00 PM London
Outage:  Electrical Maintenance
Environments Impacted:  ESA - Salvador Office
Purpose: Electrical maintenance
Backout: 
Contact(s): 	Paulo Barreto     
 
SCHEDULED SYSTEM OUTAGES: LONDON
Impact:  CORP
Time:  Fri 9/14/2001 at  6:00:00 PM CT thru Sat 9/15/2001 at  9:00:00 PM  CT
	Fri 9/14/2001 at  4:00:00 PM PT thru Sat 9/15/2001 at  7:00:00 PM   PT
	Sat 9/15/2001 at  12:00:00 AM London thru Sun 9/16/2001 at  3:00:00 AM London  
Outage:  Complete Powerdown of the London office
Environments Impacted:  All
Purpose: Installation of a third generator at Enron House
Backout: Switch all equipment back on.
Contact(s): 	Tracy Pearson    830-34238 London Tie Line
 

----------------------------------------------------------------------------------------------------------------------------
								FOR ASSISTANCE

(713) 853-1411   Enron Resolution Center


Specific Help:
Information Risk Management			(713) 853-5536
SAP/ISC                                                                               (713) 345-4727
Unify On-Call 					(713) 284-3757  [Pager]
Sitara On-Call					(713) 288-0101  [Pager]
RUS/GOPS/GeoTools/APRS			(713) 639-9726  [Pager]
OSS/UA4/TARP				(713) 285-3165  [Pager]
CPR						(713) 284-4175  [Pager]
EDI Support 					(713) 327-3893  [Pager]
EES Help Desk					(713)853-9797 OR (888)853-9797
TDS -Trader Decision Support On-Call                    (713) 327-6032 [Pager]